EXPERIENCE RECORD RECORD
Project Name | Date | Client Name | Project Details |
---|---|---|---|
Modification of Bangladesh Fisheries Development Corporation, Cox’s bazar fish landing station | July 2022 | Fisheries Engineering Co.,Ltd. Japan | Topographic survey, Bathymetric survey, Current and Discharge measurement (ADCP), Geotechnical subsoil borings (onshore and river) including Load tests |
Orion Unit-02 (1×700 MW) Coaled Fired Power Plant, Materbari | June 2022 | Orion Group | Rotary boring (89 nos. 50m ~75m depths), down hole seismic. |
Proposed LNG terminal project at Matarbari | May 2022 | Donghae Engineering -Hyundai Engineering (Korea) | Topographic survey 75 Hector, Aerial drone survey, Geotechnical survey (40 nos.) sand search boring at river 4 nos. |
Installation and Modification of Gas Stations at Off – Transmission points of GTCL project | April 2022 | Gas Transmission Company limited (GTCL) | Topographic survey & subsoil investigation works at 14 nos. proposed station at different location. (Total boring 94 nos. survey area each 3 acres) |
Pre-FS for Proposed Solar Power project at Sylhet . | March 2022 | JGC Corporation in association with Sumitomo Corporation | Topographic Survey and Hydrological study. |
Bangabandhu Sheikh Muzib Shilpa Nagar (BSMSN). | February 2022 | Sojitz Corporation/ BEZA | Core Boring, DCPT, Arial Survey By drone, Topographic Survey. |
Bangabandhus Sheikh Mujib Railway Bridge Project. | Started as of November 2021 (Ongoing) | OTJ Joint Venture. | Static GPS- GNSS Control Point & Level Fly Survey (Horizontal & Vertical) for bridge piers. |
ACI Salt Factory | December 2021-January 2022 | ACI group.(Ongoing) | Subsoil investigation and Bathymetric Survey. |
Proposed TSDF Site | November- December 2021 | New Vision Solution LTD. | Geotechnical Investigation, Pump well |
Orion Unit-02 (1×700 MW) Coaled Fired Power Plant, Char Balaki, Munshiganj | June 2021 | Orion Group | Rotary boring, CPT down hole seismic. |
Mithamoin Elevated Express way/Road | February 2021 | BBA/BUET | Geotechnical Investigation & Topography Survey and Drone survey. |
Dhaka Metro Rail line -05 (NorthernRoute) | Started as of October2020 (Ongoing) | Nippon Koei | Topography Survey and Drone survey. |
Hazrat Shahajalal International AirportTerminal-03 | Started as of December 2019 (Ongoing) | Samsung C&T | Under Ground Utility Survey & Underground Bomb Detection |
Sub Soil Investigation work at Tejgaon wire house Dhaka | 12.02.2020 | LG Butterfly Ltd. | Geotechnical Investigation |
SHARAQUA Pvt Ltd | 27.03.2020 | SHARAQUA Pvt Ltd | Geotechnical Investigation of residential Building at Gulshan-02 |
Sheikh Russel Autistic Institute | 15.03.2020 | Sikder Group | Geotechnical Investigation at Sheikh Russel Autistic Institute, Dhaka. |
SPL Petrochemical Complex Ltd. | 29.11.2020 | TK Group | Bathymetric Survey, Matrabari, Cox’sBazar. |
Samuda Food Products Ltd. | 12.10.2020 | TK Group | Geotechnical Investigation & Topographical Survey at Bangabandhu Sheikh Mujib Shilpa Nagar, Mirarsorai. |
Payra port master plan | 12.12.2019 | Royal Haskoning BV and BUET | Geotechnical Investigation at offshore (66km from Payra port to Bay of Bengal) maximum water depth 21m |
Project Name | Date | Client Name | Project Details |
---|---|---|---|
Nilphamari PV Power Plant | 16.08.2019 | EQMS Consultant Ltd | Topographic Survey & Transmission Line Survey |
Padma 50MW Solar PV Project, | 07.08.2019 | Padma Solar Power Limited | Geotechnical Investigation (Both Rotary & Percussion), Earth Resistivity Test, Geo electrical resistivity survey, & Topographic Survey |
Geotechnical Investigation at Satarkul | 16.07.2019 | Soil Layer Exploration | Boring & Coring |
Geotechnical investigation at Kanchanpur Bridge Side Project | 09.07.2019 | Bashundhara Group | Geotechnical Investigation, CBR & DCPT |
Gas1 Limited | 16.02.2019 | Gas1 Limited | Offshore Boring |
Condonium Meghbon Project | 29.12.2018 | United Group | Geotechnical Investigation |
Proposed LNG/LPG terminal project at Moheskhali, Cox’s bazar | 15.11.2018 | TK GROUP | Geotechnical Investigation (Both Rotary & Percussion) , CPTu & Topographic Survey |
Project Name | Date | Client Name | Project Details |
---|---|---|---|
200 MW Solar Power Project | 12.08.2018 | Mahindra Susten Pvt. Ltd | Pile load testing and ERT for proposed Solar Project plant at Sundarganj, Gaibandha |
Padma Bridge project | 10.03.2018 | Sinohydo Corporation Ltd | Marine geotechnical investigation and onshore Boring, CPTu |
Proposed LNG/LPG terminal project at Moheskhali, Cox’s bazar | 24.02.2018 | TK Group and SK Gas | Offshore/onshore geotechnical investigation, Geophysical study, Metocean study |
Proposed LNG/LPG terminal project at Kumira, Sitakundu | 18.02.2018 | Unitex Gas limited | Offshore geotechnical investigation |
Petrochemical complex plant at Sitakundu , Chittagong | 15.02.2018 | Zentect Engineering (End client: Basundhara Oil and Gas company Ltd.) | Geophysical, Metocean and offshore Geotechnical investigation at Shandwip Channel |
Petrochemical complex plant at Sitakundu , Chittagong | 25.12.2017 | Basundhara Oil and Gas company Ltd. | Subsoil investigation for service jetty, plant and sand search for dredging |
SS 2X660 MW Coal-Fired Power Plant of S. Alam | 14.12.2017 | SS power 1 Ltd. | Numerical modeling and geophysical survey at Banskhali |
Multibeam survey at Chauhali | 20. 11.2017 | Northwest Hydraulic Consultants Ltd. | 7 km Multibeam survey at Jamuna river |
Water Quality Survey, Soil Investigation and Test well Drilling at Araihazar EZ in Narayanganj for SAPI under FDIPP in Bangladesh | 24.10.2017 | Japan Development Institute | 3 nos Deep Tube well, assessment of ground water quality and quantity and 4 nos subsoil investigation and 100 nos Tubewell water test |
Proposed LNG/LPG terminal project at Kumira, Sitakundu | 11.09.2017 | Unitex Gas limited | Geophysical & Metocean study |
Proposed LNG/LPG terminal project at Kutubdia | 09.02.2017 | Beximco petroleum ltd | Vibro coring 6m. (Sand search 123 points at off Kutubdia) |
Proposed Power plant project at Mirersharai | 12.03.2017 | Solution gate way | Bathymetric and Metocean survey |
Proposed LNG/LPG terminal project at Kutubdia | 05.02.2017 | Beximco petroleum ltd | Metocean study |
Pilot project for Multibeam, side scan sonar & sub bottom profiler survey (demonstration project) | 19.01.2017 | Northwest Hydraulic Consultants Ltd. | Demonstration of modern offshore geophysical /bathymetric survey at Padma & Jamuna River |
Proposed LNG pipe line at Kutubdia | 06.01.2017 | Imagis Engineering Solutions Pvt. Ltd (end client Reliance power) | Topographic survey and Sub soil Investigation |
Proposed Coal based power at north Maheshkhali, Cox’bazar | 23.11.2016 | Sembcorp/Fitchner | Sub soil Investigation land and marine boring |
Proposed LNG pipe line project at Maheshkhali, Cox’bazar | 03.10.2016 | Excellerate Energy/ Fugro survey (India) Pvt. Ltd. | Topographic Survey & Bathymetric survey Works for proposed Project |
Proposed 6000 MW Ultra supercritical Coal based power plant and 3000Mw LNG plant based CC power plant at Maheshkhali, Cox’bazar | 20.09.2016 | Steag Energy Services India Pvt ltd. | Sub soil Investigation & Topographic Survey ( 5000 acres) Works for proposed Project |
Proposed LNG/LPG plant project at Kutukalii, Banskhali, Chittagong | 27.06.2016 | Beximco Petroleum Ltd. | Topographic Survey & Bathymetric & geophysical survey and Subsoil investigation |
Proposed Solar Power Project at Laxmipur | 12.06.2016 | RR Holdings Ltd | Sub soil Investigation and Topographic Survey for proposed Solar Project plant at Laxmipur, Noakhali |
Ghorashal 210 MW Repowering Project | 23.05.2016 | Guangdong Power Engineering Corporation Co. Ltd. | Sub soil Investigation & Topographic Survey Works for proposed Project Ghorashal |
Barisal 2X350MW Coal Fired Power Plant | 22.04.2016 | Isotech Engineering Services Limited | Sub soil Investigation for proposed Project plant at Taltali, Barisal |
Khulna750-850MW Combined Cycle Power Plant | 29.03.2016 | Power Energy Management & Engineering Company | Sub soil Investigation & survey works for proposed Project plant at Khulna Newsprint Mills. |
400MW Dual-Fuel Combined Cycle Power Plant | 10.02.2016 | Tiejun International(BD) | Sub soil Investigation & survey works for proposed Project plant at Sirajganj |
200 MW Solar Power Project | 12.01.2016 | Beximco Power Company Limited | Sub soil Investigation and Topographic Survey for proposed Solar Project plant at Gaibandha |
Construction of Payra Port Authority | 10.03.2016 | Payra Sea Port Authority | Sub soil Investigation for proposed Project at Kalapara, Potuakhali |
Consultancy Services for Feasibility, Detailed Survey & Design of Chittagong Hills Tract Connectivity Connecting Thegamukh and Chittagong Port | 10.06.2015 | SAI Consulting Engineers Pvt. Ltd. India | Sub soil Investigation, Topographic & Hydrological Survey survey works for proposed Project |
Project Name | Date | Client Name | Project Details |
---|---|---|---|
Sewerage Treatment plant ( SLS & TSL) | 18.03.15 | Power China Chengdu Engineering Co. Ltd | Geotechnical investigation and survey for proposed sewerage plant (DHAKA WASA) at Rampura , Dhaka |
Power plant at SHAHJIBAZAR 300MW ±20% COMBINED CYCLE POWER PLANT PROJECT | 05.03.15 | GUANGDONG POWER ENGINEERING CORPORATION | Design and installation of deep well |
Dhaka Elevated Express way | 02.03.15 | Bangladesh Bridge Authority | Right of way survey (ROW)for the proposed elevated Express way alignment. |
Dhaka Metro Rail (Line 6) | 18.12.14 | NKDM Association | Right of way survey for the 20km proposed METRO RAIL alignment. |
Coal fired power plant development project | 15.11.14 | KisoJiban Consultant Co. Ltd | Geotechnical investigation at near shore and offshore at Matarbary, Mosheskhali. Cox’s bazar |
Dhaka Metro Rail (Line 6) | 06.05.14 | NKDM Association | Topographic survey for the 20km proposed METRO RAIL alignment. |
S Alam 2X660mw supercritical coal fired power plan | 18.02.14 | S Alam group/SEPCOIII/HTG | Detail subsoil investigation, Topographical survey, Hydrographic and hydrological survey, Deep well installation and pumping test for design phase. |
Proposed 450 Mw CCPP at Ashuganj(North) | 12.01.14 | TSK Group Spain | Detail subsoil investigation & Seismic survey for the proposed 450Mw combined cycle power plant at Ashuganj . |
Western Bangladesh Bridge Improvement Project(WBBIP) | 28.12.13 | Oriental Consultants Ltd/RHD/JICA | Preparatory survey for 204 bridges at western Zone |
Chittagong Water Treatment Plant | 14.10.13 | Saman Corporation.( Korea) | Detail subsoil investigation, Topographical survey, Hydrographic survey for proposed Chittagong WASA. |
Power plant at SHAHJIBAZAR 300MW ±20% COMBINED CYCLE POWER PLANT PROJECT | 25.09.13 | GUANGDONG POWER ENGINEERING CORPORATION | Detail subsoil investigation at design phase. |
Preparatory survey for access road of proposed Coal fired power plant at Cox’s Bazar | 27.07.13 | JICA & Tokyo Electric Power Services Co. Ltd, RHD | Subsoil investigation, Topographic & Hydrographic survey for proposed access road and bridges, existing bridge/culvert condition survey of coal fired power plant at Matarbari, Moheskhali, Cox’sbazar. |
Power plant at Bibiana 344.908 MW (NET) GAS FIRED COMBIND CYCLE POWER STATION | 18.05.13 | NEPC | Detail subsoil investigation, Topographical survey, Hydrographic and hydrological survey, mathematical modeling for design phase. |
Proposed power plant at Bhola 225Mw CCPP | 12.04.13 | SWEPDI China | Detail subsoil investigation Topographical survey, Hydrographic and hydrological survey for the proposed 225Mw combined cycle power plant at Borhanuddin, Bhola. |
450 Mw CCPP at Ashuganj(South) | 28.01.13 | TSK Group Spain | Detail subsoil investigation & Seismic survey for the proposed 450Mw combined cycle power plant at Ashuganj . |
Proposed 335Mw CCPP at Shiddirganj. | 15.11.12 | IsoluxCorsan Spain | Detail subsoil investigation & Seismic survey for the proposed 325Mw combined cycle power plant at Shiddirganj ,Narayanganj |
Proposed Coal fired power plant at Cox’s Bazar | 05.10.12 | JICA & BPDB | Subsoil investigation for proposed 600X2 MW coal fired power plant at Matarbari, Moheskhali, Cox’sbazar. It includes land and marine boring and hydrological survey. |
Proposed power plant at Bhola 225Mw CCPP | 11.07.12 | LANCO International | Detail subsoil investigation & Seismic survey for the proposed 225Mw combined cycle power plant at Borhanuddin, Bhola. |
Gas Compressor Station Unit project | 05.04.2012 | Hyundai Engineering Co. | Geotechnical and Seismic survey at Ashuganj &Elengha. |
Feasibility study for Tunnel project at Chittagong under Karnophuly river | 01.04.2012 | China Communication Construction Corp. Ltd | Marine Boring at Karnophuli river |
Feasibility study for new three bridges on Dhaka-Chittagong Road | 05.02.2012 | Oriental Consultant co. Ltd & JICA (Japan) | Detail Topographic , hydrographic survey, existing bridge condition survey, Traffic survey and Detail subsoil investigation work for Katchpur, Meghna and Daudkandi Bridges. |
Electric Transmission Line | 05.04.2012 | GS Engineering& Construction Co (Korea) | Topographic survey for proposed 400 KV transmission line from BibinaSylhet to Kailiakoir, Gajipur 170km |
Mathematical & Morphological study | 10.10.2011 | Bangladesh Roads and Highway department | Hydrological and morphological study and Mathematical modeling for proposed bridges at Dacop and Jhopjopia at Khulna. |
GolapshahMazarFlyover Project | 20.09.2011 | Devcon | Topographic survey for proposed flyover project from GolapshahMazar to Zhilmill project. |
Construction of Industrial complex | 27.12.2011 | Bombay Rayon Ltd.(India) | Subsoil investigation at EPZ Nayangang for industry complex. |
Logistic terminal project at Chittagong | 01.10.2011 | China Harbor and Engineering Ltd.(China)/united group | Topographic, bathymetric and subsoil investigation work |
Reconstruction of British Embassy complex | 16.09.11 | British High Commission /Charuta Private Limited | Survey and geotechnical investigation for renovation of British high commission at Dhaka. |
Railway improvement project | 01.04. 2011 | SMEC International Pvt. Ltd. | Subsoil Investigation for proposed double line railway from Birol-Kanchan- Dinajpur to Panchagar. |
Railway improvement project | 26.03. 2011 | Max power ltd. | Subsoil Investigation for reconstruction of railway line from Faridpur to Bhanga. |
Meghna Group of Industries. | 15.03.2011 | Meghna Group | Topographic survey and subsoil investigation of proposed Cement Silo and 11 storied building at Meghnaghat. |
Meghna Petroleum Refinery | 03.03.2011 | Meghna Group | Topographic survey and subsoil investigation of proposed petroleum refinery at Meghnaghat. |
Proposed 350MW CC power plant at Meghnaghat | 11.02.11 | Summit Group | Topographic survey and subsoil investigation of the proposed 350Mw combined cycle power plant at Meghnaghat. |
Proposed power plant at Ghorashal | 22.12.10 | Max power | Topographic survey and subsoil investigation of the proposed 50Mw gas engine power plant at Ghorashal |
Proposed power plant at Basila | 20.11.10 | West power limited | Topographic survey and subsoil investigation of the proposed 50Mw gas engine power plant at Ghorashal |
Proposed power plant at Gabtoli | 01.10.10 | Dhaka North Power Co. Ltd | Topographic survey and subsoil investigation of the proposed 50Mw gas engine power plant at Gabtoli |
Proposed Express way | 28.09.2010 | ISL | Subsoil Investigation for proposed Express way 10.nos deep boring. |
Proposed Jetty/Naval base at Danger chat at Karnofuli | 20.08.2010 | MDM Consultant | Topographic survey, Hydrographic survey and subsoil investigation of the proposed Jetty and structure at Chittagong. |
Proposed power plant at Madaripur(Peat coal based) | 26.07.2010 | Shadin Bangla Powerplant/Beximco group | Topographic survey(30,000 acres) and subsoil investigation 42 nos boring and full length(continuous )sample collection. |
Proposed power plant at Keraniganj | 25.07.2010 | DPC group | Topographic survey and subsoil investigation of the proposed 100Mw power plant at Keraniganj, Dhaka |
Proposed power plant at Ashuganj | 20.07.2010 | TSK Group(Spain) | construction of the proposed 50Mw gas engine power plant at Ashuganj. |
Feasibility study for Renovation work for Meghna bridge and Gumuti bridge | 05.06.2010 | JPZ Consultant | Topographic and Hydrographic and as built survey of existing Bridge deck |
Power Plant at Bera , Pabna | 08.05.2010 | Sinamm Engineering | Topographic and Hydrographic and Subsoil investigation work for proposed power plant. |
Ruby Cement Plant | 19.04.2010 | HEIDELBERG CEMENT | Subsoil investigation for Renovation of Ruby Cement Plant at Chittagong. |
726.6 MW ONGC-Tripura Combined Cycle Power Project at Palatana , Tripura. | 05.04.2010 | ONGC Tripura Power company ltd. | Topographic Survey from Ashuganj to Akhaura for transportation of ODCs cargo |
Padma Multipurpose Bridge Project | 12.07.2009 | MAUNSELL AECOM | ADCP surveys of PADMA River, sediment sampling and test for five month. Supplying and commissioning of RTK GPS. |
PWD Improvement work | 26.04.2009 | PWD | Topographic survey at Khulna Radio center, RRF Fulbarigate, Mongla Bandar area, Dikraj Navy-gate |
Meghna Group of Industries. | 16.11.2009 | Meghna Group | Topographic survey and subsoil investigation of the proposed United Cement Industries Ltd at Meghna Ghat,11 nos. deep boring Upto 50m. |
Transcom Electronics Limited. | 17.10.2009 | Transcom Electronics Limited. | Topographic survey and subsoil investigation Construction of Industrial Building at Sadar Road, Mohakhali, Dhaka. |
Bestway Design & Development Ltd. | 25.02.2009 | Bestway Group | Topographic survey and subsoil investigation Construction of PurbacholBestway City at Purbachol, Rupganj,Narayanganj. |
Muiltipurpose Cyclone Shelter (MPCS) and Bridges of US Army Corps of Engineers, Pacific Ocean Division | 28.11. 2008 | Robsons Engineering &ConstuctionCo.Ltd | Subsoil investigation work for the proposed Bridge, Culvert & MPCS at Bagerhat, Patuahkali 60 nos. boring at coastal region in Bangladesh. |
Feasibility Study of a Deep Sea Port in Bangladesh | 28.05. 2008 | Pacific Consultants International (PCI) Japan. | 5 nos deep boring at offshore (sea) of Moheskhali for Techno-Economic feasibility study of a Deep Sea Port in Bangladesh. |
Meghna Shipbuilders & Dockyard limited | 20.04. 2008 | Meghna group. | Subsoil investigation work for the proposed shipyard at MeghnaGhat . 25 nos. deep boring at river Meghna |
Feasibility study for Sarankhola Pipe line supply system | 10-03-08 | JICA | Detail Topographic survey and mapping works at Sarankhola, Bagerhat, Khulna |
Railway improvement project | 25.02. 2008 | SMEC International Pvt. Ltd. | Feasibility study of Construction BograJamtoil Rail link project 48 nos boring on alignment |
Coastal area survey | 24-01-08 | Premiere minerals ltd. | Topographic survey along sea coast line 40 km at Teknaf. Chittagong |
Emergency Disaster Damage Rehabilitation Project | 12.01. 2008 | ACE Consultant Ltd | Topographic survey and subsoil investigation for the 36 nos. flood damaged rural bridge at different district in Bangladesh. |
Mapping SIDR effected area | 12-01-08 | High-Point Rendel (RPT) | Detail topographic survey and mapping at Majchar, Motbaria, Barisal |
Railway Sector Improvement project | 24-10-2007 | SMEC International Pvt. Ltd. | Design survey for Double truck Tongi-Bhairab Bazar rail section(64KM). |
Irrigation Project | 15-10-07 | Haskoning Netherland B.V and Associates | Engineering Survey and Investigation for GK and Manu Irrigation Project. |
Railway Chord Line Corridor | 25.04. 2007 | SMEC International Pvt. Ltd. | Feasibility study of Construction / Conversion of the Dhaka-Chittagong Railway line including Electric Traction. It includes topographic survey , existing bridge/culvert condition survey. |
STIFP II project(2nd phase). | 10-02-07 | LGED and BWDB | Detail topographic survey and Hydrographic survey of 5 town (Mymensingh, Jamalpur, Brahmanbaria, Munshiganj, Sylhet) |
Detail Area Plan(DAP) | 01-01-05 | Client: Rajuk / Sheltec | Detail topographic survey of 72,000 acres at Savar (group-E), Dhaka. |
Detail Area Plan(DAP) | 01-01-06 | Rajuk / Sheltec | Detail topographic survey of 10,000 acres at Keraniganj (group-D),Dhaka. |
Detail Area Plan(DAP) | 01-03-05 | Rajuk / DDC | Detail topographic survey of 6,000 acres at location 15 (Ashulia) Dhaka. |
Detail Area Plan(DAP) | 01-02-06 | Rajuk / Sheltec | Detail topographic survey of 7,000 acres at location 10 (Baddah-satarkul) Dhaka. |
Chittagong Port Trade Facilitation | 10-05-06 | SMEC International Pty Ltd. | Topographic survey and subsoil investigation Construction of proposed flyover of Chittagong Port Trade Facilitation Project (CPTFP) at New Mooring, Chittagong. |
Flyover ProjectJatrabari-Gulistan | 12-02-05 | Lea Consultants | Detail topographic survey for proposed Jatrabari-Gulistan Flyover Project. |
Jatrabari-Gulistan Flyover Project. | 07-05-03 | Dhaka City Corporation | Detail topographic survey and Traffic count survey for the flyover project. |
Bhairab Bridge project | 08-12-02 | Client: Edmund Nuttal Ltd. | Six monthly monitoring survey, detail topographic & Hydrographic survey for maintenance work . |
Katchpur Intersection project. | 17-06-02 | Roughton International Consultant of UK. | Detail topographic survey for design of katchpur intersection and improvement of Dhaka-Sylhet highway |
Flyover project at Mohakhali, Dhaka. | 27-12-01 | China Meteorological Construction Company | Detail topographic survey and setting out pier position |
Growth center survey at Noakhali | 14-03-01 | DPHE-Danida and LGRD | Detail topographic survey and GIS mapping for 25 nos. growth center at Noakhali. |
Jamuna Rail link project. | 04-03-01 | Design survey Consultant. | Detail topographic survey from Eashardi to Jamtail, Pubna (66 km railroad.) |
Bhairab Bridge project | 19-01-2000 | Edmund Nuttal Ltd | Topographic & Hydrographic survey. |
230 KV transmission line. | 23-11-99 | China United Electric Import & Export Corp. (CUEC) | Detailed topographic survey of 65 Km Electric transmission line from Comilla to Meghnaghat power station |
DUTP Fly-over and Intersection project | 29.08.99 | DSM Consultants. | Detail topographic survey of 16 road intersections &Mohakhali Flyover including 16Km of road in Dhaka. |
Jamuna Rail link Project | 15.03.98 | Travaux Du SudOuest | Setting Railway truck alignment from west bank of Jamuna bridge to Gajipur. |
Jamuna Multipurpose Bridge Railway link Project (ADB/WORLD) | 20.12.97 | Samwan Corporation . | Traversing for railway link west bank. |