ONGOING PROJECT OF SURVEY2000

image

Detailed Topographical survey and Geotechnical Investigation for Proposed Pipe Route at Kutubdia, Bangladesh

Date: January 6, 2017 Client: imaGIS Engineering Solutions Pvt. Ltd. Description of work: Detailed Topographic Survey and Geotechnical Investigation

image

CPGCBL & SCU Matarbari 2 Coal Fired Power Plant

Date: October 6, 2016 Client: MORSHED ASSOCIATES LTD Description of work: Detailed Geotechnical Investigation

image

Kutubdia LNG / LPG Import terminal

Date: December, 2016 Client: BEXIMCO PETROLEUM Ltd. Description of work: Geotechnical Investigation, Bathymetric and ADCP Survey

image

Moheshkhali Upazila in Cox’s Bazar District, Bangladesh

Date: 22.09.20146 Client: Steag Engineering Services (India) Pvt. Ltd. Description of work: Detail Topographic Survey (5000 acres) and Geotechnical Investigation for the Proposed Power Project

image

Dhaka Mass Rapid Transit Development Project (MRT Line-6)

Date: 08.09.2014 (Additional Works) Client: NKDM Association Description of work: Right of Way (ROW) Survey Works

image

Dhaka Mass Rapid Transit Development Project (MRT Line-6)

Date: 01.05.2014 (Additional Works) Client: NKDM Association Description of work: Detail Topographic survey, Traverse survey, Control Points Establishment with following by the Specific Standard.

Experience records of SURVEY2000:


Dhaka Elevated Express way
Date:02.03.15
Client: Bangladesh Bridge Authority
Description of work: Right of way survey (ROW)for the  proposed elevated Express way  alignment.

Sewerage Treatment plant ( SLS & TSL) 
Date:18.03.15
Client: Power China Chengdu Engineering Co. Ltd
Description of work: Geotechnical investigation and survey for proposed sewerage plant (DHAKA WASA) at Rampura , Dhaka

Power plant at SHAHJIBAZAR 300MW ±20% COMBINED CYCLE POWER PLANT PROJECT
Date:05.03.15
Client: GUANGDONG POWER ENGINEERING CORPORATION
Description of work: Design and installation of deep well

Dhaka Metro Rail (Line 6)
Date:18.12.14
Client: NKDM Association 
Description of work: Right of way survey for the 20km proposed METRO RAIL alignment.

Coal fired power plant development project 
Date:15.11.14
Client: KisoJiban Consultant Co. Ltd
Description of work: Geotechnical investigation at near shore and offshore at Matarbary, Mosheskhali. Cox’s bazar

Dhaka Metro Rail (Line 6)
Date:06.05.14
Client: NKDM Association 
Description of work: Topographic survey for the 20km proposed METRO RAIL alignment.

S Alam 2X660mw supercritical coal fired power plant
Date:18.02.14
Client: S Alam group/SEPCOIII/HTG
Description of work: Detail subsoil investigation, Topographical survey, Hydrographic and hydrological survey, Deep well installation and pumping test   for design phase. 

Proposed 450 Mw CCPP at Ashuganj(North)
Date:12.01.14
Client: TSK Group  Spain
Description of work: Detail subsoil investigation & Seismic survey for the proposed 450Mw combined cycle power plant at Ashuganj .

Western Bangladesh Bridge Improvement Project(WBBIP)
Date:28.12.13
Client: Oriental Consultants Ltd/RHD/JICA
Description of work: Preparatory survey for 204 bridges at western Zone

Chittagong Water Treatment Plant
Date:14.10.13
Client: Saman Corporation.( Korea)
Description of work: Detail subsoil investigation, Topographical survey, Hydrographic survey for proposed Chittagong WASA. 

Power plant at SHAHJIBAZAR 300MW ±20% COMBINED CYCLE POWER PLANT PROJECT
Date:25.09.13
Client: GUANGDONG POWER ENGINEERING CORPORATION
Description of work: Detail subsoil investigation at design phase, 

Preparatory survey for access road of  proposed Coal fired power plant at Cox’s Bazar
Date:27.07.13
Client: JICA & Tokyo Electric Power Services Co. Ltd, RHD
Description of work: Subsoil investigation, Topographic & Hydrographic survey for proposed access road and bridges, existing bridge/culvert condition survey of coal fired power plant at Matarbari, Moheskhali, Cox’sbazar. 

Power plant at Bibiana 344.908 MW (NET) GAS FIRED COMBIND CYCLE POWER STATION 
Date:18.05.13
Client: NEPC
Description of work: Detail subsoil investigation, Topographical survey, Hydrographic and hydrological survey, mathematical modeling   for design phase. 

Proposed power plant at Bhola 225Mw CCPP
Date:12.04.13
Client: SWEPDI China
Description of work: Detail subsoil investigation Topographical survey, Hydrographic and hydrological survey  for the proposed 225Mw combined cycle power plant at Borhanuddin, Bhola. 

Proposed 450 Mw CCPP at Ashuganj(South)
Date:28.01.13
Client: TSK Group  Spain
Description of work: Detail subsoil investigation & Seismic survey for the proposed 450Mw combined cycle power plant at Ashuganj .

Proposed 335Mw CCPP at Shiddirganj.
Date:15.11.12
Client: IsoluxCorsan  Spain
Description of work: Detail subsoil investigation & Seismic survey for the proposed 325Mw combined cycle power plant at Shiddirganj ,Narayanganj

Proposed Coal fired power plant at Cox’s Bazar
Date:05.10.12
Client: JICA & BPDB
Description of work: Subsoil investigation for proposed 600X2 MW coal fired power plant at Matarbari, Moheskhali, Cox’sbazar. It includes land and marine boring and hydrological survey. 

Proposed power plant at Bhola 225Mw CCPP
Date:11.07.12
Client: LANCO International
Description of work: Detail subsoil investigation & Seismic survey for the proposed 225Mw combined cycle power plant at Borhanuddin, Bhola. 

Gas Compressor Station Unit project
Date:05.04.2012
Client: Hyundai Engineering Co.
Description of work: Geotechnical and Seismic survey at Ashuganj &Elengha.

Feasibility study for Tunnel project at Chittagong under Karnophuly river
Date:01.04.2012
Client: China Communication Construction Corp. Ltd
Description of work: Marine Boring at Karnophuli river

Feasibility study for new three bridges on Dhaka-Chittagong Road 
Date:05.02.2012
Client: Oriental Consultant co. Ltd & JICA  (Japan)
Description of work: Detail Topographic , hydrographic survey, existing bridge condition survey, Traffic survey and Detail subsoil investigation work  for Katchpur, Meghna and Daudkandi Bridges.


Electric Transmission Line 
Date:05.04.2012
Client: GS Engineering& Construction Co (Korea) 
Description of work: Topographic  survey for proposed 400 KV transmission line from BibinaSylhet to Kailiakoir, Gajipur 170km

Mathematical & Morphological study 
Date :10.10.2011
Client: Bangladesh Roads and Highway department
Description of work: Hydrological and morphological study and Mathematical modeling for proposed bridges at Dacop and Jhopjopia at Khulna.

GolapshahMazarFlyover Project 
Date :20.09.2011
Client: Devcon
Description of work: Topographic survey for proposed flyover project from GolapshahMazar to Zhilmill project.

Construction of Industrial complex
Date:27.12.2011
Client: Bombay Rayon Ltd.(India)
Description of work: Subsoil investigation at EPZ Nayangang for industry complex.

Logistic terminal project at  Chittagong
Date:01.10.2011
Client: China Harbor and Engineering Ltd.(China)/united group
Description of work: Topographic, bathymetric and subsoil investigation work

Reconstruction of British Embassy complex
Date:16.09.11
Client: British High Commission /Charuta Private Limited
Description of work: Survey and geotechnical investigation for renovation of British high commission at Dhaka.

Railway improvement project 
Date : 01.04. 2011
Client: SMEC International Pvt. Ltd.
Description of work: Subsoil Investigation for proposed double line railway from Birol-Kanchan- Dinajpur to Panchagar.

Railway improvement project 
Date : 26.03. 2011
Client: Max power ltd.
Description of work: Subsoil Investigation for reconstruction of railway line from Faridpur to Bhanga.

Meghna Group of Industries.
Date:15.03.2011
Client: Meghna Group
Description of work: Topographic survey and subsoil investigation  of  proposed Cement Silo and 11 storied building at Meghnaghat.

Meghna Petroleum Refinery
Date:03.03.2011
Client: Meghna Group
Description of work: Topographic survey and subsoil investigation  of proposed petroleum refinery at Meghnaghat.

Proposed 350MW CC power plant at Meghnaghat
Date:11.02.11
Client: Summit Group
Description of work: Topographic survey and subsoil investigation  of the proposed 350Mw combined cycle power plant at Meghnaghat.

Proposed power plant at Ghorashal
Date:22.12.10
Client: Max power
Description of work: Topographic survey and subsoil investigation  of the proposed 50Mw gas engine power plant at Ghorashal

Proposed power plant at Basila
Date:20.11.10
Client: West power limited
Description of work: Topographic survey and subsoil investigation  of the proposed 50Mw gas engine power plant at Ghorashal

Proposed power plant at Gabtoli
Date:01.10.10
Client:Dhaka North Power Co. Ltd
Description of work: Topographic survey and subsoil investigation  of the proposed 50Mw gas engine power plant at Gabtoli

Proposed Express way 
Date:28.09.2010
Client: ISL
Description of work: Subsoil Investigation for proposed Express way 10.nos deep boring.

Proposed Jetty/Naval base at Danger chat at Karnofuli
Date:20.08.2010
Client: MDM Consultant
Description of work: Topographic survey, Hydrographic survey and subsoil investigation  of the proposed Jetty and structure at Chittagong.

Proposed power plant at Madaripur(Peat coal based)
Date:26.07.2010
Client: Shadin Bangla Powerplant/Beximco group
Description of work: Topographic survey(30,000 acres) and subsoil investigation  42 nos  boring and full length(continuous )sample collection. 

Proposed power plant at Keraniganj
Date:25.07.2010
Client: DPC group
Description of work: Topographic survey and subsoil investigation  of the proposed 100Mw power plant at Keraniganj, Dhaka


Proposed power plant at Ashuganj
Date:20.07.2010
Client: TSK Group(Spain)
Description of work: construction of the proposed 50Mw gas engine power plant at Ashuganj.

Feasibility study for Renovation work for Meghna bridge and Gumuti bridge
Date : 05.06.2010
Client: JPZ Consultant
Description of work: Topographic and Hydrographic and as built survey of existing Bridge deck
    
Power Plant at Bera , Pabna
Date : 08.05.2010
Client: Sinamm Engineering
Description of work: Topographic and Hydrographic and Subsoil investigation work for proposed power plant.

Ruby Cement Plant
Date:19.04.2010
Client: HEIDELBERG CEMENT
Description of work: Subsoil investigation for Renovation of Ruby Cement Plant at Chittagong.

726.6 MW ONGC-Tripura Combined Cycle Power Project at Palatana , Tripura.
Date : 05.04.2010
Client: ONGC Tripura Power company ltd.
Description of work: Topographic Survey from Ashuganj to Akhaura for transportation of ODCs  cargo

Padma Multipurpose Bridge Project
Date : 12.07.2009
Client: MAUNSELL AECOM
Description of work: ADCP surveys of PADMA River, sediment sampling and test for five month. Supplying and commissioning of RTK GPS.

PWD Improvement work
Date : 26.04.2009
Client: PWD
Description of work: Topographic survey at Khulna Radio center, RRF Fulbarigate, Mongla Bandar area, Dikraj Navy-gate

Meghna Group of Industries.
Date:16.11.2009
Client: Meghna Group
Description of work: Topographic survey and subsoil investigation  of the proposed United Cement Industries Ltd at Meghna Ghat,11 nos. deep boring Upto 50m.

Transcom Electronics Limited.
Date:17.10.2009
Client: Transcom Electronics Limited.
Description of work : Topographic survey and subsoil investigation  Construction of Industrial Building at Sadar Road, Mohakhali, Dhaka.

Bestway  Design & Development Ltd.
Date:25.02.2009
Client: Bestway Group
Description of work: Topographic survey and subsoil investigation  Construction of PurbacholBestway City at Purbachol, Rupganj,Narayanganj.  


Muiltipurpose Cyclone Shelter (MPCS) and Bridges of US Army Corps of Engineers, Pacific Ocean Division
Date : 28.11. 2008
Client: Robsons Engineering &ConstuctionCo.Ltd
Description of work: Subsoil investigation work for the proposed Bridge, Culvert & MPCS at Bagerhat, Patuahkali 60 nos. boring at coastal region  in Bangladesh.

Feasibility Study of a Deep Sea Port in Bangladesh
Date : 28.05. 2008
Client: Pacific Consultants International (PCI) Japan.
Description of work: 5 nos deep boring at offshore (sea) of Moheskhali for Techno-Economic feasibility study of a Deep Sea Port in Bangladesh.

Meghna Shipbuilders & Dockyard limited
Date : 20.04. 2008
Client: Meghna group.
Description of work: Subsoil investigation work for the proposed shipyard at MeghnaGhat . 25 nos. deep boring at river Meghna

Feasibility study for Sarankhola Pipe line supply system
Date: 10-03-08
Client: JICA
Description of Work: Detail Topographic survey and mapping works at Sarankhola, Bagerhat, Khulna 
    
Railway improvement project 
Date : 25.02. 2008
Client: SMEC International Pvt. Ltd.
Description of work: Feasibility study of Construction BograJamtoil Rail link project   48 nos boring on alignment 

Coastal area survey
Date: 24-01-08
Client: Premiere minerals ltd.
Description: Topographic survey along sea coast line 40 km at Teknaf. Chittagong

Emergency Disaster Damage Rehabilitation Project
Date : 12.01. 2008
Client: ACE Consultant Ltd
Description of work: Topographic survey and subsoil investigation for the 36 nos. flood damaged rural bridge at different district in Bangladesh.       

Mapping SIDR  effected area 
Date: 12-01-08
Client: High-Point Rendel (RPT)
Description: Detail topographic survey and mapping at Majchar, Motbaria, Barisal

Railway Sector Improvement  project
Date : 24-10-2007
Client: SMEC International Pvt. Ltd.
Description of work: Design survey for Double truck Tongi-Bhairab Bazar rail section(64KM).

Irrigation Project
Date: 15-10-07
Client: Haskoning Netherland B.V and Associates
Description: Engineering Survey and Investigation for GK and Manu Irrigation Project.

Railway Chord Line Corridor
Date : 25.04. 2007
Client: SMEC International Pvt. Ltd.
Description of work: Feasibility study of Construction / Conversion of the Dhaka-Chittagong Railway line including Electric Traction. It includes topographic survey , existing bridge/culvert condition survey.  

STIFP II project(2nd phase).
Date: 10-02-07
Client: LGED and BWDB 
Description: Detail topographic survey and  Hydrographic survey of 5  town (Mymensingh, Jamalpur, Brahmanbaria, Munshiganj, Sylhet)

Detail Area Plan(DAP)
Date: 01-01-05
Client: Rajuk / Sheltec
Description: Detail topographic survey of 72,000 acres at Savar (group-E), Dhaka.

Detail Area Plan(DAP)
Date: 01-01-06
Client: Rajuk / Sheltec
Description: Detail topographic survey of 10,000 acres at Keraniganj (group-D),Dhaka.

Detail Area Plan(DAP)
Date: 01-03-05
Client: Rajuk / DDC
Description: Detail topographic survey of 6,000 acres at location 15 (Ashulia) Dhaka.

Detail Area Plan(DAP)
Date: 01-02-06
Client: Rajuk / Sheltec
Description: Detail topographic survey of 7,000 acres at location 10 (Baddah-satarkul) Dhaka.

Chittagong Port Trade Facilitation 
Date: 10-05-06      
Client: SMEC International Pty Ltd.
Description of work: Topographic survey and subsoil investigation  Construction of proposed flyover  of Chittagong Port Trade Facilitation Project (CPTFP) at New Mooring, Chittagong.
    
Flyover ProjectJatrabari-Gulistan
Date: 12-02-05  
Client: Lea Consultants
Description: Detail topographic survey for proposed Jatrabari-Gulistan Flyover Project.

Jatrabari-Gulistan Flyover Project.
Date: 07-05-03
Client: Dhaka City Corporation 
Description: Detail topographic survey and Traffic count survey for the flyover project.

Bhairab Bridge project
Date: 08-12-02
Client: Edmund Nuttal Ltd..
Description: Six monthly monitoring survey, detail topographic & Hydrographic survey for maintenance work .

Katchpur Intersection project.
Date: 17-06-02
Client: Roughton International Consultant of UK.
Description: Detail topographic survey for design of katchpur intersection and improvement of Dhaka-Sylhet highway

Flyover project at Mohakhali, Dhaka.
Date: 27-12-01
Client: China Meteorological Construction Company
Description: Detail topographic survey and setting out pier position


Growth center survey at Noakhali
Date: 14-03-01
Client: DPHE-Danida and LGRD
Description: Detail topographic survey and GIS mapping for 25 nos. growth center at Noakhali.

Jamuna Rail link project.
Date: 04-03-01
Client: Design survey Consultant.
Description: Detail topographic survey from Eashardi to Jamtail, Pubna (66 km railroad.)

Bhairab Bridge project
Date: 19-01-2000
Client: Edmund Nuttal Ltd.
Description of works: Topographic & Hydrographic survey.

230 KV transmission line.
Date: 23-11-99
Client: China United Electric Import & Export Corp. (CUEC)
Description of works: Detailed topographic survey of 65 Km Electric transmission line 
from Comilla to Meghnaghat power station

DUTP Fly-over and Intersection project
Date  : 29.08.99
Client: DSM Consultants.
Description of works: Detail topographic survey of 16 road intersections &Mohakhali Flyover including 16Km of road in Dhaka.

Jamuna Rail link Project
Date  : 15.03.98
Client: Travaux Du SudOuest
Description of work: Setting Railway truck alignment from west bank of Jamuna bridge to Gajipur.

Jamuna Multipurpose Bridge Railway link Project (ADB/WORLD)
Date  : 20.12.97
Client: Samwan Corporation .
Description of work: Traversing for railway link west bank.